Grey Theatre Refurbishment, Llandough Hospital

Works involved converting the existing Theatre to a state of the art modern Operating Theatre.  We have supplied and installed a new heat recovery ventilation system to serve the Theatre and adjacent area.  Included with the scheme was a new medical gas installation and building management system.  The domestic water system was extended to the specialist sanitaryware.

The ventilation air handling units have been served via chilled water and heating coils which have been connected to the existing mains hospital services which required an out of hours shutdown..    Also, within the contract we replaced the Day Surgery AHU which needed to be replaced out of normal working hours.  During the process of keeping the existing Day Surgery running, the existing Day Surgery side had to temporarily connected to the existing AHU system to enable ventilation to continuously provide air to the patient area.  The ventilation changeovers had to be carried out on weekends.  Both the air handling units had to be broken down and flat packed.  The flat packed sections were carried up to the plantroom and placed into position ready to be built by the manufacturer.  The air handling unit was air tested and commissioned to L2 HTM standards and the ventilation is commissioned to the latest HTM standards including room pressures.

Client: Cardiff & Vale University Health Board

Contract Weeks:  20 weeks

Talk to us today and find out how we can help you:

Get in touch